Call Us: (818) 350-2372

New construction ground up 7400 squares one story on slab foundation in Brentwood. The foundation and framing has been completed with the best materials possible..

Second story addition in the city of West Lake. This structure consist of 2100 square footage. Now is ready for rafters and skylights tubing.

New construction ground up 7400 squares one story on slab foundation in Brentwood. Foundation and framing completed. Ready for mechanical.

7 town homes in Granada Hills with slab foundation with wood framing. This project is ready for roofing and stucco.

Condominium project in West LA consist of 27 units with subterranean parking with elevators. The foundation and framing is completed.

4 town homes with joint walls. Trim level structure on slab foundation. Foundation and framing are completed.

This condominium project in Los Angeles consist of 20 units. This project has subterranean parking with elevators for the comfort of their owners.

7 townhomes in Granada Hills with slab foundation with wood framing. Ready for roofing and stucco.

Mixed use 12,000 square footage in the city of Encino. This project contains stores and restaurants in the bottom and apartments on top.

10 Hometowns with wood framing and slab foundation in the city of Valley Glen. This project is ready for stucco.

FOUNDATION

FRAMING

FOUNDATION REPAIRS

ROUGH PLUMBING & ELECTRICAL

© Copyright 2022 RCS Inc | All Rights Reserved